We still to get from your part regarding the technical validation of the new rotary joint.One main point to be validated by your technical department is the max temperature of the liquid going through the hose reel. The rotary joint proposed can sustain max 80°C compared to the 200°C from the original part (with crazy lead time). Is it acceptable for this project ?